i. The Production Engineer shall responsible for preparing welding consumable procurement requirement to the Procurement Section.
ii. Before delivering welding consumable to Raiwin the batch I lot certificate for the welding consumables shall be supplied in advance and approval by QA/QC section.
iii. The QC of materials shall review and confirm the chemical composition and test requirement compliance with the application standard I specification.