The tensile strength on the cover zone concrete is termed as pull-off strength (as per BS 1881: Part 207:1992, on concrete
specimens after 28 days curing). 50 mm diameter iron discs were perfectly bonded to the concrete using an epoxy adhesive. It was tested for pull-off strength after 24 h of bonding with adhesive.