As you refer to Steel post that doesn’t proceed according to show drawing no RFA-D-021 and that is the obstacle for hotel ceiling work and also refer to the structure plan that you received during the tender and consider show drawing no. RFA-D-021
We are pleased to standfirm that framing plan and shops drawing as your reference to show the detail with comment. So, you as the designer must be consider regarding the effect that will obstacle to other part of works and need to submit the revise details must have comment in shop drawing for consideration before proceed, and doesn’t install as a typical detail that doesn’t revise according to NCR to your acknowledge and revise.
Therefore, we are pleased kindly to request you to submit the guidelines for revision. If that revise impact with façade support system, you need to present strength steel post accordingly.