Construction: Zhongfu Tai, CSGEC
Acoustician: Kahle Acoustics
roulette
From the architect. The project is located at the axis cross of the new metro line and the Lashan River. The east–west axis extends from the new high speed train station to the town center the north-south axis along the Lashan River. Both axes are leisure zones, composed out of public space and public gardens. The character between the two perpendicular parks is differentiated. Central Park should be a very active place, connected mainly to the daily activities of offices and retail. Its length is such that it should be constituted of successive sequences, different in design and adapted to the different activities on their two sides or under their surface. The “Water Park” would on the contrary have a greater unity, essentially created by the design of a water-garden treated as a built and controlled damp area.