Responsibilities
5.1.1 Contractor shall ensure that the requirements specified herein are incorporated into any procurement specifications, material or sub-contract requisitions and/or other purchase documentation produced by, or on behalf of, Contractor. 5.2 Precedence
5.2.1 Any conflict between this Engineering Standard, other Owner documentation, industry codes and standards and local regulations shall be referred to Owner for clarification prior to proceeding.
5.2.2 Any deviations to the requirements of this Engineering Standard shall be subject to Owner review and approval before proceeding.