If the total of solar, wind, and battery energies still cannot meet the demand,
the energy shortage will be supplied by an auxiliary energy source,
whose unit cost, herein, is considered $0.5 per kW h electricity. In
this study, the location of the hybrid system is assumed in such a
place where the unit cost of the auxiliary energy is more expensive
than the electricity produced by the hybrid system. Therefore, the
cost of extra energy here is decided such that it is three times as
much of the average unit cost of the electricity produced by the hybrid
system. Otherwise, if the unit cost of the auxiliary energy was
less than that of the electricity produced by the hybrid system, the
shortage could be supplied from the auxiliary energy source all the
time without the need for such a hybrid system [5]. As seen in Eq.
(6), the auxiliary energy cost is also a part of the total hybrid system
cost. Cs, Cw, CB, Csh and CT are the unit cost of photovoltaic, wind energy
generator, battery, shortage electricity, and total hybrid energy
system, respectively. BC denotes the battery capacity. Ei is the total
amount of the electricity energy shortage because of not meeting
the demand during an hour i. Cs are $5.8/Wp (mono-crystal silicon,
rated output of 75W at 1000 W/m2), $5.5/Wp (multi-crystal silicon,
rated output of 75W at 1000 W/m2) whereas Cw is US $3/W (rated
output of 5000Wat 10 m/s), and CB is $180/kW h (200 Ah 12 V lead
acid battery) [14]. Csh is $0.5 per kW h as explained above, and n is
the simulation time period, 175,200 h. In this study, the inflation
rate and time value of money are not considered.
CT ¼ Cs as þ Cw aw þ CB BC þX
n
i¼1
Csh Ei ð6Þ
In addition, a total of US $500 battery charger cost, and 5% installation,
maintenance and engineering cost of the initial hardware is
also added into the total system cost for an assumed 20-yearlifetime.
If the total of solar, wind, and battery energies still cannot meet the demand,
the energy shortage will be supplied by an auxiliary energy source,
whose unit cost, herein, is considered $0.5 per kW h electricity. In
this study, the location of the hybrid system is assumed in such a
place where the unit cost of the auxiliary energy is more expensive
than the electricity produced by the hybrid system. Therefore, the
cost of extra energy here is decided such that it is three times as
much of the average unit cost of the electricity produced by the hybrid
system. Otherwise, if the unit cost of the auxiliary energy was
less than that of the electricity produced by the hybrid system, the
shortage could be supplied from the auxiliary energy source all the
time without the need for such a hybrid system [5]. As seen in Eq.
(6), the auxiliary energy cost is also a part of the total hybrid system
cost. Cs, Cw, CB, Csh and CT are the unit cost of photovoltaic, wind energy
generator, battery, shortage electricity, and total hybrid energy
system, respectively. BC denotes the battery capacity. Ei is the total
amount of the electricity energy shortage because of not meeting
the demand during an hour i. Cs are $5.8/Wp (mono-crystal silicon,
rated output of 75W at 1000 W/m2), $5.5/Wp (multi-crystal silicon,
rated output of 75W at 1000 W/m2) whereas Cw is US $3/W (rated
output of 5000Wat 10 m/s), and CB is $180/kW h (200 Ah 12 V lead
acid battery) [14]. Csh is $0.5 per kW h as explained above, and n is
the simulation time period, 175,200 h. In this study, the inflation
rate and time value of money are not considered.
CT ¼ Cs as þ Cw aw þ CB BC þX
n
i¼1
Csh Ei ð6Þ
In addition, a total of US $500 battery charger cost, and 5% installation,
maintenance and engineering cost of the initial hardware is
also added into the total system cost for an assumed 20-yearlifetime.
การแปล กรุณารอสักครู่..
ถ้ารวมของพลังงานแสงอาทิตย์ พลังงานลม และพลังงานแบตเตอรี่ยังไม่สามารถตอบสนองความต้องการของการขาดแคลนพลังงาน
จะจัดหาแหล่งพลังงานเสริม
ที่มีต้นทุนต่อหน่วยในที่นี้ ถือว่าเป็น $ 0.5 ต่อกิโลวัตต์ชั่วโมงไฟฟ้า ใน
การศึกษาที่ตั้งของระบบไฮบริดจะถือว่าเช่น
ที่ต้นทุนหน่วยของพลังงานเสริมที่มีราคาแพงมากขึ้น
กว่าไฟฟ้าที่ผลิตโดยระบบไฮบริด ดังนั้น ต้นทุนพลังงานเพิ่ม
ที่นี่ตัดสินใจนั้นมันเป็นสามเท่า
มากของหน่วยต้นทุนเฉลี่ยของไฟฟ้าที่ผลิตโดยระบบไฮบริด
ถ้าต้นทุนต่อหน่วยพลังงานสำรองคือ
น้อยกว่าของไฟฟ้าที่ผลิตโดยระบบไฮบริด
ปัญหาอาจจะมาจากแหล่งพลังงานสำรองทั้งหมด
เวลาโดยไม่ต้องใช้เช่นระบบไฮบริด [ 5 ] เท่าที่เห็นในอีคิว
( 6 ) , ค่าใช้จ่ายพลังงานเสริมที่เป็นส่วนหนึ่งของต้นทุนระบบ
ลูกผสม CS , CW , CB , csh และ CT เป็นหน่วยต้นทุนของเซลล์แสงอาทิตย์ , พลังงานลม
เครื่องกำเนิดไฟฟ้า แบตเตอรี่ การขาดแคลนไฟฟ้าและไฮบริดพลังงาน
รวมระบบ ตามลำดับบีซีแสดงความจุของแบตเตอรี่ นี่เป็นจำนวนเงิน
ของพลังงานไฟฟ้าขาดแคลนเพราะไม่เจอ
ความต้องการในระหว่างชั่วโมง . CS เป็น $ 5.8/wp ( โมโนคริสตัลซิลิคอน
อันดับผลผลิตของมาร์คที่ 1000 W / m2 ) , $ 5.5/wp ( มัลติคริสตัลซิลิคอน
อันดับผลผลิตของมาร์คที่ 1000 W / m2 ) ในขณะที่ CW คือ US $ 3 / w ( จัดอันดับ
ผลผลิตของ 5000wat 10 m / s ) และเปิดเป็น $ 180 / กิโลวัตต์ชั่วโมง ( 200 อา 12 V
แบตเตอรี่กรดตะกั่ว ) [ 14 ]csh เป็น $ 0.5 ต่อกิโลวัตต์ชั่วโมง ตามที่อธิบายข้างต้น และ N
การจำลองช่วงเวลา 175200 ชั่วโมง ในการศึกษานี้ อัตราเงินเฟ้อ และค่าเวลาของเงิน
CT ยังไม่ได้มีการพิจารณา ¼ CS เป็นþ CW AW þ CB พ.ศ. þ x
n
ผม¼ csh 1 ไม่ð 6 Þ
โดยรวมของสหรัฐอเมริกา $ 500 ราคาเครื่องชาร์จแบตเตอรี่ และร้อยละ 5 การติดตั้ง , การบำรุงรักษาและค่าใช้จ่ายทางด้านวิศวกรรมของ
เริ่มต้นคือฮาร์ดแวร์นอกจากนี้ยังเพิ่มในระบบต้นทุนรวม 20 yearlifetime สันนิษฐาน .