Please kindly noted ,There is some matter that we have just been informed from the forwarder as well:
- 1 x 40 ‘HQ to load 27/5 and ETD 29/5 ETA 1/6 the PO is 4500254861 this schedule the vessel delay in the letter per attachment.
So, the new ETD is 3/6 , ETA 6/6
- 1 x 40 ‘HQ to load 27/5 and ETD 31/5 ETA 3/6 the PO is 4500260617 this schedule the vessel delay in the same letter per attachment.
So, the new ETD is 3/6 , ETA 6/6