5. The period of delivery of the buses.
The winner of the tender to deliver 200 electric passenger cars by gradual delivery into three periods as detailed below.
5.1 The period within 180 days from the date of signing the contract winner must deliver electric bus delivery fleet of 50 vehicles.
5.2 second installment within 240 days from the date of signing the contract winner must deliver an additional 50 buses, electric vehicles.
5.3 The third installment within 300 days from the date of signing the contract winner must submit additional electric delivery fleet of 100 vehicles.