The Blast holes for primary blasting are of 250 mm and 150 mm in diameter. IR/Russian drills of 250 mm diameter are used. Drill diameter of 150 mm are used in new benches and crawler mounted drills are also deployed for clearing the boulders. Blast holes are drilled to depth of 14.0 m including sub-grade drilling.