Thank you very much on your contribution.
I found that weight and volume is within the specification however the green portion needs to increase a little bit.
The stick length outside of the product is clearly see that it’s longer than the standard.
Dear BeE & all,
BeE will take the lead to consolidate a result with Packaging team together with the list of action plans as discussed with SC team on late Monday night.
P’Toon will help to do a drop test by comparison a physical damage of Tang Mo (1st trial) VS. Tang Mo (2nd trial).
We will regroup with SC & Stefanus to discuss and confirm lead time to all corrective actions and the 3rd factory trial before move forward to commissioning.
The latest project network is attached for your information.
Note: We could not miss the commissioning deadline which is fixed on 21st July 2015.