This shall include identifying the required construction space, including drill entry and exit points, elevated stringing pads, pipe hauling access, as early as possible, as well as identifying the owners of the temporary dwellings, collating the names of the head occupants, compiling a list for submission to Owner who shall have the responsibility of negotiating compensation for the occupants to remove their dwellings for the duration of the construction period required by the Contractor.