350 SOFTWARE TESTING: Principles, Techniques and roots
• Test manager shall install the application and conduct installation testing, smoke testing and sanity testing, Installation may not be required for few applications.
For complete testing Of each iteration, the following cycle is followed.
• Application is installed With all prerequisites. If installation is not required, this Step Can be omitted. • Test cases are executed as per sequence defined.
• Test log is updated with actual results.
• Defects are added in defect database.