Planing Work: Check Shop Dwg. Steel Door.
Rebar Work.
Rebar Slab Work., Drop Panel Work, CB Wall Toilet.
Drainage for Lab., Toilet No.2 Wiring Cable.
Drawing Electrical and Incument Check.
Install Drain Pipe PVC at Kitchen Room.
Check Bolt Foundation.
Safety control Site and Safety Patrol.
Install Steel Bar G-Slab. Temp. Scaffolding Utility Bldg.
Casting Concrete Road.
Casting Concrete Road.
Line . Level Road.
Shop DWG. LPG Yard Rev.Shop DWG.
Shop DWG. Document and Summery Concrete.
Document Work: Invoice and Po.Spot.