Thank you kindly for the update. Please continue this afternoon on resolving the following issues:
• PID control
• CIP velocity & homo / positive pump bypass during the purge line step and heat long loop step
o Extra programming
• Temperature and conductivity readout of the CTs
• Fixing the leaking temperature transmitter
Tomorrow we need to be able to run production on water.