The production supervisor used the Control Chart data to draw a Histogram and check for Normal distribution, then calculate Cpk, across samples from a week's work, as in the figure below . This showed that the process was currently so capable that inspection could be dropped and the new limits still met. This turned out to be as a result of old specification limits coupled with several recent process improvements.