Just a few minutes before, we was on phone to get an update drawing for the transformer. Here in is our updated drawing: in between two existing and erected post; we are supposed to erect a station of two new posts at approved by the owner place (which is at 10 meter from the nearest existing post to the power house). The supplier last drawing is then to update. Actual situation of the site is in picture attached. The Generator is on site this evening.
Thanks All