The dispatching logic called from the RMS Dispatch screen has been modified so that locmovesize_creation_stockpackets broom tasks are always created after the dispatch document is saved. Previously, the broom tasks were created before the document was saved, causing the tasks to fail if they were processed before the dispatch was saved.