• 8. Regarding installation of the Goods, the Purchaser shall prepare the installation site according to the plan and details as appear in Appendix III. The Seller shall pay for the costs of installation as well as for the materials and equipment for maintenance within………………………months after completion of the installation.
• 8.1 The Purchaser shall select the site of installation of the Goods and shall arrange for the installation of a proper electrical system as well as adjust the installation room temperature to conform to the standards suggested by the Seller within at least………………days prior to the installation schedule.
• 8.2 In case of a delay in the agreement of the site and equipment as well as the electrical system and telephone lines in Clause 8.1; the Seller and the Purchaser agree to postpone the delivery date. This shall not be considered a breach of contract.
• 8.3 The Seller shall install the Goods by employing labor, equip¬ment and components at his own cost, exclusive of installation costs of parts related to cables connecting the equipment and components attached to the Goods within the same building. The period of installation shall be within ………………..days.