Because the wheat enters the raw materials depot cylinder from the top and exits from the bottom during processing, the relationship between processing batches and raw material batches can be estimated using FIFO.
One batch of raw materials may be divided into several processing lines to process, so the processing batch code should include the processing line number and processing date to properly identify the product.