Subsurface horizontal flow constructed wetlands are being evaluated for nitrogen (N) and phosphorus (P)
removal from wastewater in this study through different gravel sizes, plant densities (Iris pseudacorus),
effects of retention times (1 to 10 days) on N and P removal in continuously fed gravel wetland.