In order to demonstrate the novel approach of estimating
confidence intervals (CI), the annual peak flow at Potomac
River at Point of Rocks, MD, USA (source: US Geological Survey
http://water.usgs.gov/nwis/peak) from 1895–2013 (water year from
October to September) was studied. The respective data are presented
in