Dear K. Arjtawee ,Rivatec /Quality Department.
CC. Rivatec Team.
Subject: KHS follow up problem Thrust W/S skip process machining at Rivatec.
KHS follow up problem Thrust W/S skip process machining.
Part no.6K5956000
Schedule.
Date. : 15-09-16 (Thursday)
Time. : 14.00 PM.
Place. : Rivatec.
KHS Member. 3 person.
Rivatec please prepare document support about analysis root cause /
flow out and countermeasure each item action.
- Flow process
- Control plan
- WI working production.
- WI packing final process.
- Standard appearance check or Q-point inspection of part.
- Method control gauge check and calibration.(Drawing Gauge)
- Compare countermeasure between before and after each item action.
Please rivatec confirm E-mail reply to KHS on date 13-09-16.