A rough approximation
of the savings in line construction is 30%. Although breakeven
distance is influenced by the costs of right-of-way and
line construction with a typical value of 500 km, the concept
itself is misleading because in many cases more ac lines are
needed to deliver the same power over the same distance due
to system stability limitations