After UTCT finalize vendors evaluation of gantry crane rails replacement project , the lowest bidder offered the whole project covered raw material and labor cost at THB.7.7M before VAT with the lead time of 90-120 maximum.
UTCT would like UTSE to reconsider repair and material cost from last quotation whether or not UTSE could match the offer both price of raw material / labor cost including lead time condition with the current lowest bidder.