SUFFICIENT SPACE SHALL BE LEFT AROUND THE INSTRUMENT FOR LIFTING OF INSTRUMENT COVERS. THE MINIMUM CLEARANCE BETWEEN ANY PART OF THE INSTRUMENT AND SURROUNDING STRUCTURES OR EQUIPMENT SHALL NOT BE LESS THAN 300 MM TO ALLOW FOR INSULATION, PAINTING, ETC.