It is noteworthy that the mines other than HVC have elected to rely on manual surveying
with a total station carried to pre-installed base stations. The base station is typically
a concrete filled pipe with a permanently installed tribrach. Manual surveying is
labour intensive and exposes survey personnel (and the total station) to inclement