Please look in this file, and let me know possibility to do according to this monthly plan.
Currently there are around 735MT, and would be 15% of NG in 2016.
• Should control quantity to make pellet in each month, grinding in GSE then make pellet at LTH.
• Total 625MT of produced regrind in each month, done by GSE.
In detail, there would be many kinds of material such as GREEN / WHITE / Conductive / etc.
But we could arrange and make it close to this plan.