In Scenario 1, all the MSW, including bio-waste, would be
transported 317 km to incineration plant with annual capacity of
120 000 t of feedstock in Oulu (blue arrow on Fig. 5). In this Scenario,
the nutrients of bio-waste would be lost in the incineration
process and the transportation distance would be longer than the
status quo.