K Simon,
FYI . see how improving of fruit ripeness , That is big impact to both total recovery and fan/choice packed ratio , On Nov 18, fruit ripeness in preparation is 50 % compare to unload where the number use for paying the ripeness incentive is 45 % ,It effected to total recovery increase to 49 .66 std. case /ton and fancy/chioc packed @ 17 .5 std. case /ton.
Yesterday we suppose to get 850 tons but we have problem on # 10 empty can shortage due to electrical problem at # 10 empty can production line , So we have to stop cannery at 6.00 pm.
Tomorrow we will drop the ripeness incentive from 14 baht/kg to 12 .5 baht/kg and expected to start running @ 900 tons/day at HH cannery on Monday. We will have worker enough for 900 tons/day on Monday without reduction of cup production volume from original plan. So our volume in this period it will over than budget , Hope we will see good number on VTS
Regards.
Montein W.