Thus, the reactant consumption
was calculated imposing the same outlet value of HCl
concentration assumed for the 2S system (2 mg/N m3). The single
stage conversion required was calculated accordingly. Under these
assumptions, the costs related to the operation of the single stage
systems were estimated for the different waste composition
scenarios.