1.5 LOADING OF USED PROGRAM
This point is depending on the operationg PLC as well as on the software used and should be
Work up separately with trainee A description to load the PLC program into the PLC could be found in logiCAD (see short description logiCAD)
1.6 TESTING OF EXECUTION first check respective normal position by the hand of the user program. Please handle as follows:
- operation of NOT-AUS-mushroom actuator
-unlock NOT-AUS-mushroom actuator
-a shork actuation of Richten-button-module moves to normal position-green light is on
Normal position is defined by:
-shunt in normal position at S0.5
-all tracks are empty S0.7,S0.8 and S0.9 are not actuating
For starting of the sequence, please push the Start-button after the green light is on.
The green light goes out. The operation sequence of the project please see in our descrition
“Project Working”.