pressure under 350 kPa (50 psi). Where cracks or openings
extend through a structure, such as a wall, the opening is
usually sealed and ported on the far side as well.
Where appearance is not a factor, openings may often be
sealed by caulking with cloth or fabric that pass water or air
yet retain solids. Paper and materials that remain plastic are
not suitable for this purpose.
The spacing of the entry ports is largely a matter of
judgment based on the nature of the work. As a general
rule, however, ports should be farther apart than the desired
depth of grout penetration.
Before grouting, the openings should be flushed with
clean water, subject to the procedure that is used in grouting.
Flushing is done for several reasons: to wet the interior
surfaces for better grout flow and penetration; to check the
effectiveness of the surface sealing and port system; to
provide information on probable grout flow patterns and
internal interconnections, some possibly unexpected; and to
familiarize the grouting crew with the situation.
Grouting is started at one end of a horizontal opening or at
the bottom of a vertical opening and continues until grout
shows at the second port away from the one being pumped.
When this occurs, the grouting operation moves to the next
port and continues until grout again shows at the second
distant hole. The valve should be shut or plugged at each
flowing port before moving to the next injection location.
Progress should be monitored on the far side of the structure,
if accessible, and close ports or valves as necessary.
Grouting is usually started with a relatively thin grout,
thickened as quickly as possible to the heaviest consistency
that can be pumped without blockage, as determined at the
grouting operation.
b) Interior grouting—Grouting of cracks, joints, and voids
from the interior is done through 25 mm (1 in.) or larger
diameter holes drilled at an angle to intersect the opening at
desired depth from the surface or, as near as possible, to the
bottom of the void.
Drilling is done with diamond core bits, rotary carbide
bits, or percussion drills. Diamond or rotary bit drilling is
preferred, especially when the openings to be grouted are
relatively narrow, to minimize the debris that would choke
the crack. Applying a vacuum to the drill stem further
reduces the possibility of drill cuttings getting into the crack.
For wider openings—for example, 12 mm (0.5 in.) or
more—drill cuttings are less of a problem, but in any event,
all holes should be thoroughly washed and water circulated
through the system before grouting.
2.6.6.2 Chemical grouting—Chemical grout, as defined
in this guide, is any fluid material not dependent on suspended
solids for reaction. The grout should harden without
adversely affecting any metals or the concrete boundaries of
the opening or void into which it has been injected. From the
standpoint of the user, chemical grouts are usually twocomponent
systems requiring blending at or near the point of
injection, or the blending of the injected chemical with
moisture or water existing in the crack or placed there by the
grouter. Chemical grouts may contain various inert fillers to
modify physical properties, such as consistency and heat generation, and to increase volume. Chapter 3 describes
materials for chemical grouting.
Chemical grout should be injected from the surface or the
interior in the same general manner as cement grouts with
the exception that, for unfilled grouts, the port sizes may be
3 or 6 mm (0.1 or 0.2 in.) in diameter, and the port devices
may be mechanically anchored or cemented into place (ACI
224.1R, 503.4, and 503.6R).
2.6.6.3 Selection of type of grout—Questions that may be
considered when the type of grout is to be selected for a
given repair include:
1. Is it necessary to transmit compression, tension, shear,
or a combination across the crack?
2. Is the crack active (moving) and subject to future tensile
forces that may exceed the tensile or shear strength of the
concrete in the vicinity of the repaired crack, or exceed the
elongation and creep characteristics of the grout?
3. Is preventing water or air movement through the crack
all or part of the requirement?
4. Is the crack width sufficient to accept the type of grout
selected?
5. Does the required internal grout pressure exceed the
resistance of the structure or of the surface sealer?
6. Is the rate of grout stiffening slow enough to permit the
grout to reach its destination and fast enough to minimize
leakage from the blind side?
7. Is the exothermal heat liberation of some chemical
grouts, especially epoxy types, excessive?
8. Is the grout cost effective in relation to desired or
required results?
9. Are the shrinkage, creep, and moisture absorption characteristics
of the grout compatible with the project conditions?
10. Is the viscosity low enough and the pot life long
enough to ensure full penetration of the crack, particularly
small cracks in a large concrete mass?
11. Are the wetability characteristics of the resin capable
of ensuring an acceptable bond?
12. Will the epoxy adhesive cure in the presence of moisture
without absorbing moisture and compromising the bond
ความดันต่ำกว่า 350 กิโลปาสคาล ( 50 psi ) ที่รอยแตกหรือช่องว่าง
ขยายผ่านโครงสร้าง เช่น ผนังเปิดคือ
มักจะปิดผนึกและ ported อีกด้านเช่นกัน .
ที่ปรากฏไม่ใช่ตัวแปร เปิดบ่อยอาจจะปิดผนึกด้วยกาวกับ
ผ้าหรือผ้าที่น้ำผ่านหรืออากาศ
ยังเก็บของแข็ง กระดาษและวัสดุที่เป็นพลาสติก
ไม่เหมาะกับวัตถุประสงค์นี้ระยะห่างของการท่าเรือเป็นส่วนใหญ่เรื่องของ
การตัดสินขึ้นอยู่กับลักษณะของงาน ในฐานะที่เป็นกฎทั่วไป
, อย่างไรก็ตาม , พอร์ตควรห่างกันกว่าที่ต้องการ ความลึกของยาแนว
.
ก่อนยาแนว , ช่องควรล้างด้วยน้ำสะอาด
ภายใต้กระบวนการที่ใช้ในการยาแนว
ล้างเสร็จแล้วสำหรับหลายเหตุผล :
เปียกภายในพื้นผิวที่ดีและแนวรุกไหล เพื่อตรวจสอบประสิทธิภาพของพื้นผิวที่ปิดผนึกและ
ระบบพอร์ต ; ให้ข้อมูลเกี่ยวกับรูปแบบการไหลและการเชื่อมโยงภายในแนวน่าจะเป็น
บางอาจจะไม่คาดคิด และคุ้นเคย อัดฉีดลูกทีม
ตามสถานการณ์ มีการเริ่มต้นที่ปลายด้านหนึ่งของการเปิดแนวนอนหรือที่
ด้านล่างเปิดแนวตั้งและต่อไปจนกว่าแนว
แสดงที่พอร์ตที่สองห่างจากคนที่ถูกสูบ .
เมื่อปัญหานี้เกิดขึ้น อัดฉีดการดำเนินการย้ายไปยังท่าเรือหน้า
เรื่อยไปจนแนวอีกครั้งแสดงในวินาที
ไกลหลุม วาล์วจะปิด หรือเสียบที่พอร์ตแต่ละ
ไหลก่อนที่จะย้ายไปยังตำแหน่งถัดไป
ฉีด .ควรติดตามความคืบหน้าในด้านไกลของโครงสร้าง
ถ้าเข้าถึงได้ และปิดพอร์ตหรือวาล์วเป็นสิ่งจำเป็น
อัดฉีดมักจะเริ่มต้นด้วยยาแนวบางค่อนข้าง
ขึ้นอย่างรวดเร็วที่สุดเท่าที่จะหนักสม่ำเสมอ
ที่สามารถสูบโดยไม่อุดตัน ตามที่กำหนด ในการอัดฉีด
.
b ) ควรยาแนวรอยแตกของการตกแต่งภายใน , ข้อต่อ , และช่องว่าง
จากภายในผ่าน 25 มิลลิเมตร ( 1 นิ้ว ) หรือหลุมขนาดเส้นผ่าศูนย์กลางขนาดใหญ่
เจาะเป็นมุมไปเปิดที่ระดับความลึกจากพื้นผิวตัดกัน
ที่ต้องการ หรือ ใกล้ที่สุดเท่าที่เป็นไปได้เพื่อ
ด้านล่างของโมฆะ เจาะเสร็จด้วยบิตหลักเพชร , คาร์ไบด์
หมุนบิต หรือการฝึกซ้อม เคาะ เพชรบิตเจาะ หรือหมุนเป็น
ที่ต้องการ โดยเฉพาะเมื่อเปิดจะค่อนข้างแคบ บนสุดเป็น
,เพื่อลดเศษจะสำลัก
ร้าว การใช้เครื่องเจาะลำต้นต่อไป
ลดความเป็นไปได้ของการตัดเจาะเข้าไปในรอยแตก .
สำหรับเปิดกว้างตัวอย่างเช่น 12 มม. ( 0.5 นิ้ว ) หรือ
ตัดเจาะเป็นน้อยของปัญหา แต่ในกรณีใด ๆ ,
ทุกหลุม ควรล้างให้สะอาดและน้ำหมุนเวียน
ผ่านระบบ ก่อนการยาแนว
2.6.6 .ปูนยาแนวเคมี 2 เคมี ตามที่
ในคู่มือนี้ คือของเหลววัสดุใด ๆที่ไม่ขึ้นกับระงับ
ของแข็งปฏิกิริยา กาวยาแนวควรแข็งโดยไม่
ส่งผลกระทบต่อโลหะใด ๆหรือขอบเขตของคอนกรีต
เปิดหรือช่องว่างที่ถูกฉีดเข้าไป จากมุมมองของผู้ใช้สารเคมี
,
twocomponent ปูนมักจะ
การแปล กรุณารอสักครู่..