According to the visited on 11 December 2014 of Syngenta's team ,Kh. taweesak , Kh. Chirapa and Kh. Sirinya The purpose of this visited was check a progress of new factory's construction. K.Arthit presented the time table and progress of construction. Then they survey the construction area and they gave us the suggestion as below;

1.Section Weight Scale For Truck
- Documents calibration of “Weight Scale For Truck” : Complete Action by Chanathip
- Form of Weight Scale For Truck : Action by Kh.Sirinya and complete on 15 December 2014

2.Section Receiving
- Conveyor line sorting must be have guard for the waste discarded.
Action by : Kh.Arthit confirm
- The loading area should be the fence to prevent employees fall
- For Hopper must be have rubber bumpers mounted in the inside

3.Section dryer
-The grating on - off the top cover bin dryer should redesign. because staff will work hard and are at risk of accidents.
- On the top floor of the building should have a fire escape ladder added another 1 point.
- Should have safety equipment to employees working in high places.
- Report on the steps to perform to keep the corn to measure humidity.
- Report to operation procedure to clean the corner in the tank.
- Install rubber bumpers all areas of risk that may impact the product.
- The Bin Dryer is on the side of the building there is a risk that rain fall will be put, Therefore, should be installed canopy side.

4.Section Shelling
- Install rubber bumpers all areas of risk that may impact the product
-Confirm to operation procedure to clean Shelling Machinery : Action by Chanathip
-Confirm to Process flows out of ear corn between Shelling and Preclean :Action by Chanathip
- Should be installed scaffolding for the maintenance of the motor at the top of Shelling machinery

5.Section Area Finish good Product
-Should install the wall to prevent rain . Because it may cause damage to product
-construction of the slope to the car forklift can drive up easily.

Topics which have been resolved, I will report them to the next.
0/5000
จาก: -
เป็น: -
ผลลัพธ์ (ไทย) 1: [สำเนา]
คัดลอก!
According to the visited on 11 December 2014 of Syngenta's team ,Kh. taweesak , Kh. Chirapa and Kh. Sirinya The purpose of this visited was check a progress of new factory's construction. K.Arthit presented the time table and progress of construction. Then they survey the construction area and they gave us the suggestion as below;

1.Section Weight Scale For Truck
- Documents calibration of “Weight Scale For Truck” : Complete Action by Chanathip
- Form of Weight Scale For Truck : Action by Kh.Sirinya and complete on 15 December 2014

2.Section Receiving
- Conveyor line sorting must be have guard for the waste discarded.
Action by : Kh.Arthit confirm
- The loading area should be the fence to prevent employees fall
- For Hopper must be have rubber bumpers mounted in the inside

3.Section dryer
-The grating on - off the top cover bin dryer should redesign. because staff will work hard and are at risk of accidents.
- On the top floor of the building should have a fire escape ladder added another 1 point.
- Should have safety equipment to employees working in high places.
- Report on the steps to perform to keep the corn to measure humidity.
- Report to operation procedure to clean the corner in the tank.
- Install rubber bumpers all areas of risk that may impact the product.
- The Bin Dryer is on the side of the building there is a risk that rain fall will be put, Therefore, should be installed canopy side.

4.Section Shelling
- Install rubber bumpers all areas of risk that may impact the product
-Confirm to operation procedure to clean Shelling Machinery : Action by Chanathip
-Confirm to Process flows out of ear corn between Shelling and Preclean :Action by Chanathip
- Should be installed scaffolding for the maintenance of the motor at the top of Shelling machinery

5.Section Area Finish good Product
-Should install the wall to prevent rain . Because it may cause damage to product
-construction of the slope to the car forklift can drive up easily.

Topics which have been resolved, I will report them to the next.
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 2:[สำเนา]
คัดลอก!
According to the visited on 11 December 2014 of Syngenta's team ,Kh. taweesak , Kh. Chirapa and Kh. Sirinya The purpose of this visited was check a progress of new factory's construction. K.Arthit presented the time table and progress of construction. Then they survey the construction area and they gave us the suggestion as below;

1.Section Weight Scale For Truck
- Documents calibration of “Weight Scale For Truck” : Complete Action by Chanathip
- Form of Weight Scale For Truck : Action by Kh.Sirinya and complete on 15 December 2014

2.Section Receiving
- Conveyor line sorting must be have guard for the waste discarded.
Action by : Kh.Arthit confirm
- The loading area should be the fence to prevent employees fall
- For Hopper must be have rubber bumpers mounted in the inside

3.Section dryer
-The grating on - off the top cover bin dryer should redesign. because staff will work hard and are at risk of accidents.
- On the top floor of the building should have a fire escape ladder added another 1 point.
- Should have safety equipment to employees working in high places.
- Report on the steps to perform to keep the corn to measure humidity.
- Report to operation procedure to clean the corner in the tank.
- Install rubber bumpers all areas of risk that may impact the product.
- The Bin Dryer is on the side of the building there is a risk that rain fall will be put, Therefore, should be installed canopy side.

4.Section Shelling
- Install rubber bumpers all areas of risk that may impact the product
-Confirm to operation procedure to clean Shelling Machinery : Action by Chanathip
-Confirm to Process flows out of ear corn between Shelling and Preclean :Action by Chanathip
- Should be installed scaffolding for the maintenance of the motor at the top of Shelling machinery

5.Section Area Finish good Product
-Should install the wall to prevent rain . Because it may cause damage to product
-construction of the slope to the car forklift can drive up easily.

Topics which have been resolved, I will report them to the next.
การแปล กรุณารอสักครู่..
ผลลัพธ์ (ไทย) 3:[สำเนา]
คัดลอก!
According to the visited on 11 December 2014 of Syngenta's team ,Kh. taweesak , Kh. Chirapa and Kh. Sirinya The purpose of this visited was check a progress of new factory's construction. K.Arthit presented the time table and progress of construction. Then they survey the construction area and they gave us the suggestion as below;

1.Section Weight Scale For Truck
- Documents calibration of “Weight Scale For Truck” : Complete Action by Chanathip
- Form of Weight Scale For Truck : Action by Kh.Sirinya and complete on 15 December 2014

2.Section Receiving
- Conveyor line sorting must be have guard for the waste discarded.
Action by : Kh.Arthit confirm
- The loading area should be the fence to prevent employees fall
- For Hopper must be have rubber bumpers mounted in the inside

3.Section dryer
-The grating on - off the top cover bin dryer should redesign. because staff will work hard and are at risk of accidents.
- On the top floor of the building should have a fire escape ladder added another 1 point.
- Should have safety equipment to employees working in high places.
- รายงานตามขั้นตอนที่จะดำเนินการเพื่อให้ข้าววัดความชื้น .
- รายงานการผ่าตัด เพื่อความสะอาด มุม ใน ถัง
- ติดตั้งยางกันชนพื้นที่ทั้งหมดของความเสี่ยงที่อาจส่งผลกระทบต่อสินค้า .
- ถังเครื่องเป่าด้านข้างอาคารมีความเสี่ยงว่าฝนตก จะ จะใส่ ดังนั้น ควรติดตั้งกันสาดข้าง


4.section ปลอกกระสุน- Install rubber bumpers all areas of risk that may impact the product
-Confirm to operation procedure to clean Shelling Machinery : Action by Chanathip
-Confirm to Process flows out of ear corn between Shelling and Preclean :Action by Chanathip
- Should be installed scaffolding for the maintenance of the motor at the top of Shelling machinery

5.Section Area Finish good Product
- ควรติดตั้งผนังป้องกันฝน เพราะอาจทำให้เกิดความเสียหายกับผลิตภัณฑ์
- ก่อสร้างทางลาดรถรถสามารถขับขึ้นได้ง่าย

หัวข้อที่ได้รับการแก้ไข ผมจะรายงานให้ต่อไป
การแปล กรุณารอสักครู่..
 
ภาษาอื่น ๆ
การสนับสนุนเครื่องมือแปลภาษา: กรีก, กันนาดา, กาลิเชียน, คลิงออน, คอร์สิกา, คาซัค, คาตาลัน, คินยารวันดา, คีร์กิซ, คุชราต, จอร์เจีย, จีน, จีนดั้งเดิม, ชวา, ชิเชวา, ซามัว, ซีบัวโน, ซุนดา, ซูลู, ญี่ปุ่น, ดัตช์, ตรวจหาภาษา, ตุรกี, ทมิฬ, ทาจิก, ทาทาร์, นอร์เวย์, บอสเนีย, บัลแกเรีย, บาสก์, ปัญจาป, ฝรั่งเศส, พาชตู, ฟริเชียน, ฟินแลนด์, ฟิลิปปินส์, ภาษาอินโดนีเซี, มองโกเลีย, มัลทีส, มาซีโดเนีย, มาราฐี, มาลากาซี, มาลายาลัม, มาเลย์, ม้ง, ยิดดิช, ยูเครน, รัสเซีย, ละติน, ลักเซมเบิร์ก, ลัตเวีย, ลาว, ลิทัวเนีย, สวาฮิลี, สวีเดน, สิงหล, สินธี, สเปน, สโลวัก, สโลวีเนีย, อังกฤษ, อัมฮาริก, อาร์เซอร์ไบจัน, อาร์เมเนีย, อาหรับ, อิกโบ, อิตาลี, อุยกูร์, อุสเบกิสถาน, อูรดู, ฮังการี, ฮัวซา, ฮาวาย, ฮินดี, ฮีบรู, เกลิกสกอต, เกาหลี, เขมร, เคิร์ด, เช็ก, เซอร์เบียน, เซโซโท, เดนมาร์ก, เตลูกู, เติร์กเมน, เนปาล, เบงกอล, เบลารุส, เปอร์เซีย, เมารี, เมียนมา (พม่า), เยอรมัน, เวลส์, เวียดนาม, เอสเปอแรนโต, เอสโทเนีย, เฮติครีโอล, แอฟริกา, แอลเบเนีย, โคซา, โครเอเชีย, โชนา, โซมาลี, โปรตุเกส, โปแลนด์, โยรูบา, โรมาเนีย, โอเดีย (โอริยา), ไทย, ไอซ์แลนด์, ไอร์แลนด์, การแปลภาษา.