According to the visited on 11 December 2014 of Syngenta's team ,Kh. taweesak , Kh. Chirapa and Kh. Sirinya The purpose of this visited was check a progress of new factory's construction. K.Arthit presented the time table and progress of construction. Then they survey the construction area and they gave us the suggestion as below;
1.Section Weight Scale For Truck
- Documents calibration of “Weight Scale For Truck” : Complete Action by Chanathip
- Form of Weight Scale For Truck : Action by Kh.Sirinya and complete on 15 December 2014
2.Section Receiving
- Conveyor line sorting must be have guard for the waste discarded.
Action by : Kh.Arthit confirm
- The loading area should be the fence to prevent employees fall
- For Hopper must be have rubber bumpers mounted in the inside
3.Section dryer
-The grating on - off the top cover bin dryer should redesign. because staff will work hard and are at risk of accidents.
- On the top floor of the building should have a fire escape ladder added another 1 point.
- Should have safety equipment to employees working in high places.
- Report on the steps to perform to keep the corn to measure humidity.
- Report to operation procedure to clean the corner in the tank.
- Install rubber bumpers all areas of risk that may impact the product.
- The Bin Dryer is on the side of the building there is a risk that rain fall will be put, Therefore, should be installed canopy side.
4.Section Shelling
- Install rubber bumpers all areas of risk that may impact the product
-Confirm to operation procedure to clean Shelling Machinery : Action by Chanathip
-Confirm to Process flows out of ear corn between Shelling and Preclean :Action by Chanathip
- Should be installed scaffolding for the maintenance of the motor at the top of Shelling machinery
5.Section Area Finish good Product
-Should install the wall to prevent rain . Because it may cause damage to product
-construction of the slope to the car forklift can drive up easily.
Topics which have been resolved, I will report them to the next.