Being a capital-
intensive project, it requires heavy investment in fixed assets like plant and machinery, building,
insulation and panels. Depending on the size of the project and design of the infrastructure,
the Capex is derived. Typically, a traditional cold storage of multi-tier walk in with a capacity
of 6,000 tons would cost `5 crore, excluding land.
Being a capital-intensive project, it requires heavy investment in fixed assets like plant and machinery, building,insulation and panels. Depending on the size of the project and design of the infrastructure,the Capex is derived. Typically, a traditional cold storage of multi-tier walk in with a capacityof 6,000 tons would cost `5 crore, excluding land.