The results show that BoxeBehnken method leads to an average error of 1.35% by using 15 data and a
ten-term polynomial equation while the mathematical model leads to an error of 0.09% using 60
experimental data and a thirty-term polynomial equation. In other words implementing design of experiments
could be relied upon as a rapid and elementary method for estimation of production rate in a
gas lift operation, due to its simplicity and requiring only few numbers of experiments. This model can
also determine the impact of each well on total oil production, which is of great importance in gas lift
operations especially when gas injection is limited. Although in this method we left out the interaction
effects between the wells, it can be used for initial estimation of assessment of gas lift wells.