In the case of the Hirer to terminate the contract prematurely. It is not the fault of the Contractor, The Hirer shall be inform the Contractor in advance report at least 30 days. In this case the Hirer have to pay a termination fee prior to the Contractor is an amount equal to 50 percent of the costs to be paid from the date of termination until the final maturity date. However, the termination fee must obtain the consent of the Contractor first.