Positioning: A Garmin GPS receiver was used to
detect the position. This type of measuring is
adequate for open construction site and would not
work inside the buildings. Any other similar
positioning technique is appropriate. The position
sampling in this case is 1 second; an important
parameter to take in consideration for decision
making regarding risk situations. The position
reading is transmitted to the control center via
radio.