. The development of a total system involves four major
steps: (1) development of unique, problemoriented large scale integrated devices; (2)
linear digital control system theory preliminary design; ( 3 ) nonlinear simulation/controller design; and (4) hardware-in-the-loop/ real-time simulation capability for identification, calibration, and verification.