The attached file is a result of flood report from Pinthong Industrial Park Co.,Ltd. (PIP) that we have complained.
The PIP have replied to us on today that due to the motorway no.7 are construction and affect for the drainage system and present already provided the culver under road to drain rainwater is completed.