As discussed with you in the morning, for these big bore pipes, PM need to do light back gouging and back welding one layer with GTAW to clear the internal welding defects. TJEL QC will check and clear all acceptable joints. But it is PM duty to make sure the defects pointed out by TJEL QC are repaired on time and not missed out.