challenges in regard to realize continuous testing,
การทดสอบอย่างต่อเนื่อง
(2) increased maintenance effort with an increase in the number of releases,
ความพยายามในการบำรุ่งรักษาอย่างต่อเนื่อง
(3) management overhead due to the need for coordination between teams,
ค่าใช้จ่ายในการประสานงานระหว่างทีม
(4) detailed dependencies are not discovered on a detailed level due to lack of focus on design,
(5) long requirements engineering duration, due to complex decision processes in requirements engineering,
(6) requirements priority lists are hard to create and maintain,
(7) waiting times in the process, specifically in design waiting for requirements,
(8) reduction of test coverage due to shortage of projects and lack of independent testing,
(9) increased configuration management effort.