- Over 100 trains per day in and out of the San Pedro Bay Gateway to 14 U.S. markets
- 7 of 8 container terminals equipped with on-dock rail
- 30% of all containerized cargo moves by on-dock rail (On-dock rail capacity is 6 million TEU’s; by 2035, it will be 17 million TEU’s)
- By 2035, over $500 million will be spent for on-dock rail expansions with another $600 million spent outside our marine terminals