After drying supplier should secure that the MC will remain in same limits as target MC, stated in corresponding drying schedule. Preferred way is to control wood EMC (Equilibrium Moisture Content) at storage and/or storage time.• Material shall not reach production for at least 48h after drying process or until the material is cooled down to ambient temperature.