Just finish talking with VMC, I ask K. Nuy to use the original sample that I signed off put on the checking fixture. The original master sample should pass all the check point as we do not change anything on the main checking fixture.
We had adjust template for both ORA and VMC jig to me the same to prevent issue mismatching. The new template will give correct position on the pointer, and original master sample at VMC will pass all the check point on the template.