upplier shall have system in place to calibrate the Damping force tester with OK and NOK master samples before start of production every production.
Note: Supplier shall demonstrate compliance to session 8.2 Damper setting definition process of the shocks core engineering specification ES9CP1-18045-AB dated: 10/20/10