Dear Miss Sunantinee Jankaew
Please find
1.) Our more detailed proposal
2.) The completed Milmeq spec sheet
3.) Comparisons manual blast v's automatic carton tunnel.
Additional Client questions from the drawing
1.) How to sort 3 SKU? - We sort the 3 SKU's at the palletizing area. There is no point in sorting twice.
2.) The Operator - what does he do? - There is no operator in this area as it is a fully automatic tunnel. The figure on the drawing is just to show that we have provided people access to this area.
3.) How do you unload if the one SKU freezing already? - The unload is from a separate level which is located immediately below the infeed load level.
4.) 3 SKU load into shelf pair and freezing will not mixed? - I do not fully understand the question. However with your carton size mix the freeze time for all cartons will be the same. Hence we recommend randomly loading all cartons into the tunnel and sorting into the 3 SKU's at palletizing only. This will make for a much more simplified and reliable tunnel.