Where x=critical level, and is generally chosen the 30cm or 50cm [6]; di = the i day of groundwater depth, cm; m= the number of days of depth to groundwater back to the control level, d; SFW=cumulative depth of surface water; n= the number of flooding days; hi = the i day of surface depth, cm. The improved model as follows[8][17]: