The general construction requirements must also be consistent with actual project requirements. Review warranty and guarantee provisions for both acceptability and feasibility. All conflicts between specification sections or between specifications and drawings, should be resolved. Finally, the PM should provide input to special provisions convering items such as construction office details. CPM scheduling requirements, utility relocation, and other non-design issues.