(1) At the development trial phase, the group which is responsible to prepare the development trial
samples (usually Production Engineering Group) shall prepare the control plan.
(2) At the production trial phase and mass production phase, the Production Engineering Group shall,
under cooperation with the CFT (SASG: K10-04A), prepare the control plan.