I think we need install the rail into the rack first. Please call your vendor if they can help you or not. Little bit complicate as your server room was small.
Before put the server in the rack. You need install the extra net card. And prepare 8 CAT6 LAN cable. Please let me know as soon as all these ready.
Please do not power it on until we confirm all connection is correct. Thanks.